10.24423/engtrans.675.2017
Planning, Monitoring and Control of Mechanics Projects by the BIM
References
Hardin B., McCool D., BIM and construction management: proven tools, methods, and workflows, Wiley, Indianapolis, 2015.
Boton C., Kubicki S., Halin G., The challenge of level of development in 4D/BIM simulation across AEC project lifecyle: a case study, Procedia Engineering, 123: 59–67, 2015, doi: 10.1016/j.proeng.2015.10.058.
Han K.K., Cline D., Golparvar-Fard M., Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs, Advanced Engineering Informatics, 29(4): 889–901, 2015, doi: 10.1016/j.aei.2015.10.006.
Zhou Y., Ding L., Wang X., Truijens M., Luo H., Applicability of 4D modeling for resource allocation in mega liquefied natural gas plant construction, Automation in Construction, 50: 50–63, 2015, doi: 10.1016/j.autcon.2014.10.016.
Moon H., Dawood N., Kang L., Development of workspace conflict visualization system using 4D object of work schedule, Advnaced Engineering Informatics, 28(1): 50–65, 2014, doi: 10.1016/j.aei.2013.12.001.
García-Sanz-Calcedo J., González A.G., López O., Salgado D.R., et al., Analysis on integrated management of the quality, environment and safety on the industrial projects, Procedia Engineering, 132: 140–145, 2015, doi: 10.1016/j.proeng.2015.12.490.
DOI: 10.24423/engtrans.675.2017